Welcome to the 'Managers and Professionals - Full Test'
This practice test will select 50 random questions, which you will be expected to complete within the allocated 45 minute time limit. You will be shown correct and incorrect answers at the end of the quiz.
Each question is representative of the type used in the Managers and Professionals Test.
Instructions:
- The test will begin after you select the 'Start Quiz' button below.
- For each question, choose from the multiple choice answers provided.
- Some questions may have more than one answer, a note will be displayed when to do this.
- After the last question, click 'Submit' to be shown your results.
Ready? Click 'Start Quiz' to begin.
1.
In case of an emergency on site, what should you do first?
2.
What is the most effective measure to manage the risk of reversing site vehicles?
3.
Under current CDM regulations, who is responsible for preparing construction phase health and safety plan for a notifiable project?
4.
Why is edge protection required when working at height?
5.
What additional measure is required when someone wears a harness while working at height?
6.
If someone collapses with stomach pain and no first aider is on site, what should you do first?
7.
What is an early indication of noise-induced hearing damage?
8.
What precautions should be taken before eating or drinking after exposure to lead?
9.
If doubts arise about a building's stability, a demolition contractor should consult:
10.
Where should you go if you hear the fire alarm?
11.
Why should you avoid touching the nozzle of a CO2 fire extinguisher?
12.
Why should you avoid walking behind a reversing lorry?
13.
When should eye protection be worn on site?
14.
When must the HSE be informed of a reportable dangerous occurrence on site?
15.
When should personal protective equipment (PPE) be considered for health and safety measures?
16.
Which of the following directly controls how work is performed on site?
18.
What should be done after having a couple of pints of beer at lunchtime?
19.
What is the least dependable information source for evaluating a powered percussive hand tool's vibration level?
20.
What is the meaning of this sign?
21.
Upon discovering previously unidentified underground services, what action should a contractor take?
22.
What necessitates caution when handling oxygen cylinders by contractors?
23.
If you're using a wheelbarrow to move a heavy load, does this constitute manual handling?
24.
What is NOT a danger when walking through sludge or muck at the bottom of a small enclosed space?
25.
Which TWO details would you expect to find on a PAT test label?
26.
What must all workers do when undertaking manual handling?
27.
What health issue can result from inhaling dust in the atmosphere over long periods?
28.
What is the safe way to enter a deep excavation?
29.
Among FFP1, FFP2, and FFP3 rated disposable masks, which provides the greatest protection for workers?
30.
Which action has the highest priority under the principles of prevention and protection?
31.
How can pedestrians best avoid being hit by site vehicles?
32.
What kind of rest area should be provided for workers on site?
33.
Where should the client, principal designer, and principal contractor's names and addresses be located?
34.
When is an employer obligated to supply PPE?
35.
What is the meaning of this sign?
36.
Where are you likely to find asbestos containing materials (ACMs)?
37.
What does it mean when a site is issued a prohibition notice?
38.
A hot work permit specifies that work must be:
39.
What is an effective way to ensure good health and safety standards on a demolition project?
40.
Identify which hazards when someone nearby cuts concrete blocks with a disc-cutter. (Select more than one)
41.
Who should erect mobile tower scaffolds to ensure safety during a high-altitude inspection?
42.
Who is responsible for initially providing pre-construction information under current CDM regulations?
43.
What is HSG 168 'Fire Safety in Construction'?
44.
What should you do if contractors arrive with generic risk assessments?
45.
Emergency routes on construction sites must provide safe passage to:
46.
What is a duty of the top man when working in a confined space?
47.
Which of the following is true regarding a ladder used to access a scaffolding platform?
48.
What TWO arrangements should a contractor have to alert workers to overhead electric cables?
49.
Why should waste plaster and plasterboard be separated from other waste types?
50.
Where should LPG cylinders used for heating site cabins be placed for safety?