Welcome to the 'Specialists - Demolition'
This practice test will select 10 random questions, which you will be expected to complete within the allocated 10 minute time limit. You will be shown correct and incorrect answers at the end of the quiz.
Each question is representative of the type used in the Specialists Test.
Instructions:
- The test will begin after you select the 'Start Quiz' button below.
- For each question, choose from the multiple choice answers provided.
- Some questions may have more than one answer, a note will be displayed when to do this.
- After the last question, click 'Submit' to be shown your results.
Ready? Click 'Start Quiz' to begin.
1.
During demolition of older buildings, what is the most common source of high blood lead levels in workers?
2.
What is the meaning of the abbreviation SWL?
3.
If you are reversing mobile plant and lose sight of the banksman/marshaller guiding you, what must you do?
4.
Which of these statements best reflects how to manage the safe working load of equipment?
5.
What is required before cutting up disused fuel tanks?
6.
In which situation would it be unsafe to use a scissor lift?
7.
Where should LPG cylinders be placed when supplying a site cabin?
8.
When removing brickwork or internal masonry walls manually, which approach is considered the safest?
9.
Which statement about machine use is correct?
10.
On a construction/demolition site, what is the minimum separation distance for storing oxygen cylinders from propane, butane, or other fuel gases?