Welcome to the 'Managers and Professionals - Refresher Quiz'
This practice test will select 10 random questions, which you will be expected to complete within the allocated 10 minute time limit. You will be shown correct and incorrect answers at the end of the quiz.
Each question is representative of the type used in the Managers and Professionals Test.
Instructions:
- The test will begin after you select the 'Start Quiz' button below.
- For each question, choose from the multiple choice answers provided.
- Some questions may have more than one answer, a note will be displayed when to do this.
- After the last question, click 'Submit' to be shown your results.
Ready? Click 'Start Quiz' to begin.
1.
The correct procedure for using a tower crane to offload a lorry involves:
2.
If you need to inspect a site with high noise levels and the operation can't be shut down, what should the site manager do?
3.
What is a common example of fragile roof material?
4.
As the responsible professional, what is the first action to take if health and safety standards decline on a project site?
5.
Why should guard-rails be placed around the top of an excavation?
6.
What should you do if the site toilets don't flush?
7.
When is it necessary to record an accident in the accident book?
8.
What is the meaning of this sign?
9.
Except for work on a domestic client, in which situation must HSE be notified of a project under current CDM regulations?
10.
Why is an RCD (residual current device) necessary for 230 volt electrical equipment?