Welcome to the 'Specialists - HVACR - Ductwork'
This practice test will select 10 random questions, which you will be expected to complete within the allocated 10 minute time limit. You will be shown correct and incorrect answers at the end of the quiz.
Each question is representative of the type used in the Specialists Test.
Instructions:
- The test will begin after you select the 'Start Quiz' button below.
- For each question, choose from the multiple choice answers provided.
- Some questions may have more than one answer, a note will be displayed when to do this.
- After the last question, click 'Submit' to be shown your results.
Ready? Click 'Start Quiz' to begin.
Who should carry out leakage testing on a newly installed ductwork system?
You need to work for several days on a flat roof of a two-storey building, about 1 metre from the edge, where there is only a low parapet. What is the best way to reduce the risk of falling?
How should extension leads be arranged while being used on site?
Which of these should be used when cutting aluminium or tin ductwork that is pre-insulated with fibreglass? (Choose TWO)
When opening and setting up a stepladder, what is essential for it to be used safely?
When drilling through a wall, when must eye protection be worn?
If a newly installed item of plant has not yet been commissioned, how should it be left?
When erecting a mobile tower, which significant hazard must be considered?
When preparing a lifting operation, how should the step-by-step sequence for carrying out the lift safely be set out?
When work is taking place in a riser, how should entry be controlled?