Welcome to the 'Specialists - HVACR - Ductwork'
This practice test will select 10 random questions, which you will be expected to complete within the allocated 10 minute time limit. You will be shown correct and incorrect answers at the end of the quiz.
Each question is representative of the type used in the Specialists Test.
Instructions:
- The test will begin after you select the 'Start Quiz' button below.
- For each question, choose from the multiple choice answers provided.
- Some questions may have more than one answer, a note will be displayed when to do this.
- After the last question, click 'Submit' to be shown your results.
Ready? Click 'Start Quiz' to begin.
What must be done before a mobile tower is moved?
When erecting a mobile tower, which significant hazard must be considered?
A worker using a solvent-based duct sealant starts complaining of nausea and headaches. What should you do first?
If you require extra temporary wiring for power tools while working on site, what should you do?
When joining plastic-coated metal ductwork, which method presents the greatest health risk?
If a newly installed item of plant has not yet been commissioned, how should it be left?
When preparing a lifting operation, how should the step-by-step sequence for carrying out the lift safely be set out?
What is the safest way to move a fan-coil unit over a distance?
Where should LPG cylinders be located when they are supplying an appliance in a site cabin?
You are told to install high-level ductwork from a platform above an open stairwell, but the platform has no edge protection. What should you do?