Welcome to the 'Specialists - Demolition'
This practice test will select 10 random questions, which you will be expected to complete within the allocated 10 minute time limit. You will be shown correct and incorrect answers at the end of the quiz.
Each question is representative of the type used in the Specialists Test.
Instructions:
- The test will begin after you select the 'Start Quiz' button below.
- For each question, choose from the multiple choice answers provided.
- Some questions may have more than one answer, a note will be displayed when to do this.
- After the last question, click 'Submit' to be shown your results.
Ready? Click 'Start Quiz' to begin.
1.
What should be done if a wire rope sling is found to be damaged or defective?
2.
During demolition of older buildings, what is the most common source of high blood lead levels in workers?
3.
Which statement about machine use is correct?
4.
On a demolition project, where is the formal method for managing and controlling identified hazards normally set out?
5.
If the machine/plant you are operating has faulty or ineffective brakes, what is the safest action to take?
6.
How does the FOPS safety feature protect an operator of mobile plant?
7.
Which item could a 17-year-old trainee demolition operative use without direct supervision?
8.
When are head and tail lights required on mobile plant (like excavators, dump trucks etc.)?
9.
What condition is most commonly linked to repeated use of hand-held breakers or drills?
10.
Where should LPG cylinders be placed when supplying a site cabin?