Welcome to the 'Specialists - Demolition'
This practice test will select 10 random questions, which you will be expected to complete within the allocated 10 minute time limit. You will be shown correct and incorrect answers at the end of the quiz.
Each question is representative of the type used in the Specialists Test.
Instructions:
- The test will begin after you select the 'Start Quiz' button below.
- For each question, choose from the multiple choice answers provided.
- Some questions may have more than one answer, a note will be displayed when to do this.
- After the last question, click 'Submit' to be shown your results.
Ready? Click 'Start Quiz' to begin.
1.
What is the FIRST priority when asbestos material is suspected in a building to be demolished?
2.
Before any demolition work takes place close to overhead power lines/cables, who should be contacted for guidance and precautions?
3.
How frequently must lifting accessories receive a formal thorough examination?
4.
While excavating, you uncover a buried service (pipe/cable) that was not shown or identified beforehand. What is the correct immediate response?
5.
In which situation would it be unsafe to use a scissor lift?
6.
What information must be clearly displayed on all lifting equipment?
7.
In what situation is it permissible to carry a passenger on a machine?
8.
If the machine/plant you are operating has faulty or ineffective brakes, what is the safest action to take?
9.
What is the correct action when leaving mobile plant unattended?
10.
On a demolition project, where is the formal method for managing and controlling identified hazards normally set out?