Welcome to the 'Managers and Professionals - Full Test'
This practice test will select 50 random questions, which you will be expected to complete within the allocated 45 minute time limit. You will be shown correct and incorrect answers at the end of the quiz.
Each question is representative of the type used in the Managers and Professionals Test.
Instructions:
- The test will begin after you select the 'Start Quiz' button below.
- For each question, choose from the multiple choice answers provided.
- Some questions may have more than one answer, a note will be displayed when to do this.
- After the last question, click 'Submit' to be shown your results.
Ready? Click 'Start Quiz' to begin.
1.
How can a site worker verify the correct operation of the RCD (residual current device) for a 230 volt hand tool?
2.
When entering a "hearing protection zone," you are required to:
3.
What should you do if you find an unmarked container potentially containing chemicals?
4.
What action should you take when you see this label on a substance?
5.
What might happen if workers destroy a nesting bird's nest during a renovation project?
6.
What should you do if asked to move a load that might be too heavy and cannot be divided or assisted?
7.
What should you do if you need to operate a power tool with a rotating blade?
8.
In assessing the risk of using a potentially hazardous substance, the contractor should first:
9.
If drivers cannot easily see advance roadwork signs due to poor visibility or obstructions, what should the contractor do?
10.
Why is reporting near-miss incidents on site important?
11.
Must those in charge of sites provide a first-aid box?
12.
When observing an excavator digging a trial pit, liquid dripping and forming a pool under the machine may indicate:
13.
If you see someone working above a damaged safety net, what should you do?
14.
According to current CDM regulations, if a designer appoints another designer or contractor, they must:
15.
What must an employer do if manual lifting activities are part of a task?
16.
What should a contractor do if they find a defective wire rope sling?
17.
For a new build notifiable project under current CDM regulations, the client must ensure construction doesn't start until:
18.
In the context of noise, what does the term 'upper exposure action value' represent?
19.
When should a vehicle's amber flashing beacon be activated?
20.
To whom should risks and control measures from a COSHH assessment be explained?
21.
When is the appropriate time to report environmental incidents and near misses at a site?
22.
To prevent what should workers handling harmful substances wear the right protective gloves?
23.
How should a safety helmet be positioned on your head to ensure maximum protection?
24.
Identify TWO documents addressing specific hazards of confined space demolition work.
25.
If you find a nesting bird where you need to work, what action should you take?
26.
Which TWO details would you expect to find on a PAT test label?
27.
To ensure the effectiveness of a worker's respiratory mask fit, what is one check you can make?
28.
What is a common example of fragile roof material?
29.
Direct sunlight on bare skin can cause what?
30.
Who should perform a planned task that carries significant risk?
31.
If you're using a wheelbarrow to move a heavy load, does this constitute manual handling?
32.
What are the TWO primary aspects to visually inspect before using a power tool?
33.
What is the least dependable information source for evaluating a powered percussive hand tool's vibration level?
34.
What is NOT a danger when walking through sludge or muck at the bottom of a small enclosed space?
35.
What would you expect an appointed first aider on a construction site to be responisble for?
36.
What is the best way to avoid the risk of someone becoming trapped in an excavation?
37.
Which statement best captures the ideal attitude for improving health and safety on construction sites under CDM regulations?
38.
What is an early indication of noise-induced hearing damage?
39.
What principal risk is posed when excavating next to a building or structure?
40.
What to do if someone falls from height and has no feeling in their legs?
41.
Where should the client, principal designer, and principal contractor's names and addresses be located?
42.
What must be done with the inflation pump when using airbags with a controlled leak rate?
43.
Why should you not remove a nail from someone's foot if you're not a first aider?
44.
Why is it dangerous to use oversized inflatable airbags for fall arrest in a confined area?
45.
A fuel storage tank on site must have a protective bund to capture any spill. What is the minimum required capacity of the bund?
46.
A near miss refers to an incident where:
47.
If a principal designer is not appointed on a notifiable site you plan to visit, what should you do?
48.
What should be done after having a couple of pints of beer at lunchtime?
49.
Why should guard-rails be placed around the top of an excavation?
50.
Who must be notified of a death, major injury, dangerous occurrence or over three-day injury on a site?
Comments are closed